Case study

Leitradlofts, Cologne, Cologne, Germany, Germany

Leitradlofts, Cologne

The conversion of industrial buildings is always a particular challenge. The task for the Leitradlofts in Cologne was to build up a variable heat and drinking water supply system for 52 office units in a former marine propeller factory. Home stations in combination with the loop-through ring installation ensure optimal hygiene and high comfort. In addition, the newly erected pellet local heating central plant was connected through the very flexible Ecoflex piping system.

Project Facts

Cologne, Germany, Germany
Office building
Eristetyt Ecoflex-putkistot, Komposiittijärjestelmä
Completion: 2016

Uponor Involvement

Uni Pipe PLUS | RTM-fittings | ISI box | composite piping system | Ecoflex

Modern building complex with industry character 

The Leitradlofts is an architecturally and constructionally ambitious project that entails the complete gutting of an old marine propeller factory that had been standing empty for more than 20 years. Step-by-step, a modern building complex with 12,000 m² of office space will arise as a type of factory for the creative economy. The first construction phase encompasses a total of 52 units covering four floor levels. These can be combined flexibly into office landscapes ranging from 95 m² to a maximum of 2,400 m² size. 

 

Impeccable hygiene through home stations and loop-through ring installation

To ensure optimal drinking water hygiene every unit was equipped with a separate home station. This ensures fresh hot water provision directly on site as needed. Furthermore central hot water and circulation lines in the supply shafts are not required. The sanitary facilities with two toilet rooms and one kitchen per unit were connected by means of the loop-through ring installation. This means that every tapping point receives its water through the ring from two sides, so that stagnations in the lines can be avoided reliably. In addition, further consumers can be included simply and flexibly if required. 

 

Economical installation with Uni Pipe PLUS and RTM Fittings 

The loop-through ring installation in the 52 units and the connection of the radiators were carried out throughout with the pre-insulated multi-layer composite piping Uni Pipe PLUS. This is characterized by its narrow bending radii as well as high form stability. The pipe connections are realized with the RTM-Fittings with integrated press functions, without requiring tools, thus allowing rapid and reliable processing. This made it possible to lay about 12 kilometers of composite piping without a single classic mechanically pressed connection – thus reducing the required installation time by approximately 90 working days.  

 

Local heating network with very flexible Ecoflex pipes 

The Leitradlofts are supplied completely with regenerative heat. Since the complete area does not have a basement, a separate central heating plant with two 200 kW pellet boilers was erected to this purpose. This also meant that about 400 meters of local heating pipes had to be laid between old foundations and the remaining steel and concrete supports. Here the Ecoflex piping system can exploit its high flexibility to the full extent. Although the pipes themselves are very robust, the pre-insulated pipes could be laid rapidly and simply through core drillings and also around corners with narrow radii.

Leitradlofts, Cologne

Leitradlofts Köln

Project Information

Project Information

Address
50672 Cologne, Germany
Country
Germany
Website
http://www.leitrad.koeln/
Completion
2016
Project Type
New building
Building Type
Office building
Product lines
Ecoflex Supra PLUS, Ecoflex Aqua, Ecoflex Thermo, Ecoflex Supra, Ecoflex Supra Standard, Ecoflex Quattro

Partners

Partners

Planner/installer:
Guido Schaefer GmbH, Alsdorf

Building owner and architect:
Hartmut Gruhl, Cologne

Similar projects

Bayer Qingdao ECB Lighthouse

Bayer Qingdao ECB Lighthouse

ECB Lighthouse, which serves as the administration building of a Bayer MaterialScience plant in Qingdao, is the first building in China of the Bayer Eco Commercial Building (ECB) Program.
The installation of Uponor storm water cassettes in Shopping Center Karisma, Lahti

The installation of Uponor storm water cassettes in Shopping Center Karisma, Lahti

In November 2011 one of the largest shopping centers of Finland was opened in Lahti. The Karisma shopping centre is one of Finland´s largest shopping centers measured by sales area and number of stores. Developer of Karisma is Kesko. Construction of Karisma has been one of the biggest investments ever in retail trade of Kesko. The main contractor of Karisma was SRV Rakennus ltd.
Day-care centre to be built with energy piles

Day-care centre to be built with energy piles

As requested by the City of Vantaa, the Vaaralanpuisto day-care centre has been planned based on the "nearly 0 energy days" concept. Construction work for the day-care centre began in late summer 2016, and the project will be completed in July 2017. Project costs are estimated at EUR 5.4 million, and the day-care centre will accommodate about 130 children. Among the various energy production options available for the site, the City of Vantaa chose the energy pile and solar thermal collector system jointly developed by Uponor and Ruukki.
Klimahaus Bremerhaven 8°

Klimahaus Bremerhaven 8°

The Klimahaus Bremerhaven 8° Ost in Germany is a science centre that presents climate and climate change topics in a comprehensible scientific manner.
Auron

Auron

The Uponor Contec ON concrete surface activation heats and cools the AURON office building complex in Munich.
Berliner Bogen

Berliner Bogen

Berliner Bogen in Hamburg – cutting-edge architecture combined with state-of-the-art technology
Energy Efficiency Center

Energy Efficiency Center

The foyer, information centre and conference room at the Energy Efficiency Centre in Würzburg uses the Uponor Klett line for energy-efficient radiant heating and cooling.
Ericusspitze Spiegelhaus

Ericusspitze Spiegelhaus

New company HQ of the Spiegel Group is located at the Ericusspitze. The concrete core activation from Uponor ensures pleasant temperature levels in the building.
Kranhaeuser

Kranhaeuser

Fantastic, modern architecture directly on the Rhine in Cologne - the Kranhaus buildings
Brain Box Berlin

Brain Box Berlin

Thermal concrete core activation with Uponor Contec provides economical, energy-efficient and sustainable building temperature control in the new landmark Adlershof Science and Technology Centre.

 

First Uponor Comfort Panel project in Hungary

First Uponor Comfort Panel project in Hungary

An office building, where proper comfort is provided for doing your job The commercial buildings provide more or less limited space as the workplace for people. Therefore cooling the air is an important factor in maintaining their comfort during their stay. In order to keep the daily work undisturbed, the system used should be installed easily, should be efficient economically, and should be hygienic.
Immeuble Delta Green

Immeuble Delta Green

La dalle active Uponor est intégrée depuis 2017 dans l’immeuble Delta Green, bâtiment tertiaire de 4600m2 comprenant 4 niveaux. Celui-ci est le premier bâtiment de la région tout à fait autonome en énergie.

Standard Bank

Standard Bank

Uponor PE-Xa pipe used for refurbishment of chilled water pipelines in the head office of South Africa's Standard Bank located in Johannesburg.
Palazzo Ferrazzi - Brescia

Palazzo Ferrazzi - Brescia

Uponor brings the comfort of its Underfloor Heating & Cooling to a prestigious renovation project to transform a Norther Italy 1700s Palace into comfortable offices
Posco Green building

Posco Green building

POSCO Green Building located on the Yonsei University International Campus in Songdo,  has been equipped with radiant underfloor heating and cooling and Comfort panels from Uponor.
National Library of Latvia

National Library of Latvia

National Library of Latvia is the most impressive industrial project in Latvia of the last decade. Uponor provided the building with Uponor underfloor heating and MLCP pipes.
Agder fengsel in Norway

Agder fengsel in Norway

Statsbygg har fått i oppdrag av Justisdepartementet å bygge nytt fengsel i Agder, med avdelinger i Mandal og på Froland. Uponor fikk i oppdrag med å levere gulvvarme til begge fengslene, ca 100 000 meter med rør. Det er lagt gulvvarme i alle  rom på begge prosjektene. Uponor har også levert tappevann; Mandal fengsel med nye PPM fordelere, Froland fengsel messingfordelere. Uponor har også levert noe Ecoflex rør til prosjektene.
The New Deichmanske Library - Bjørvika, Oslo

The New Deichmanske Library - Bjørvika, Oslo

Deichman is equipped with Thermally Active Building System - a system for storing the energy in the concrete ceiling. It is primarily a cooling system, but it can also be used as a heating system. When in cooling mode, no energy is used as the heat is drawn into the concrete, only when it is transferred from the concrete and into the water pipes that are cast in the decking. The need for installed power is reduced, and operating expenses are significantly reduced as opposed to in a air-based cooling system. The TABS is cast into the Prefab elements, which is a BubbleDeck construction with spans up to 10.5 meters.
BAE Systems Rochester

BAE Systems Rochester

BAE systems are the third largest global defence company, delivering a range of products for the air, land and naval armed forces.
Rivergate

Rivergate

The RIVERGATE office building in Vienna, Austria, was certified as a Green Building by the EU andrelies on the efficient Contec ON concrete surface activation.
Berger Logistik

Berger Logistik

Berger Logistik transports goods by land, sea and air around the globe. The company was founded in 1961 by Johann Berger and is based in Wörgl, in the Tyrol region of Austria. 
Sunesis school scheme: Sacred Heart Primary School, West Midlands

Sunesis school scheme: Sacred Heart Primary School, West Midlands

Uponor were nominated as the sole supplier for radiant heating systems for the Sunesis Schools schemes, with Main Contractor Willmott Dixon. Sunesis is a Joint Venture between Scape and Willmott Dixon, built on the combined experience of public sector know-how and private expertise. They are the market leader in delivering pre-designed buildings across a range of market sectors. Every design has a defined layout, specification, fixed cost and timescale to construct. The full benefits of a full BIM model are also utilised.

New office in Västerås with a focus on modern and environmentally friendly solutions

New office in Västerås with a focus on modern and environmentally friendly solutions

The plumbing company Mälardalens Rör in Västerås moved from their premises that they had been in since the end of the 80s. In November 2021, the first test trench was taken and at the turn of the year 2022/2023 they moved into the new office on a plot of land they have owned for a long time. We visited and spoke with the owners Robert Lind and Veronica Lange to hear more about the project.
HAMK's zero-energy hall uses energy piles

HAMK's zero-energy hall uses energy piles

Construction of Finland's first virtually zero-energy hall was completed in May 2015. The hall was built for the Thin Sheet Centre research unit of the Häme University of Applied Sciences (HAMK) and it draws its energy primarily from energy piles and solar panels.
Institut les Mines Telecoms Saclay

Institut les Mines Telecoms Saclay

Le bâtiment d’enseignement supérieur et de recherche pour l’Institut Mines-Télécom intègre un système de dalle active sur une surface de 40 000 m2. Le bâtiment économe en énergie accueillera une gamme variée d’activités propres à l’Institut Mines - Télécom : formations, recherches, transfert et innovation.

Villeroy & Boch

Villeroy & Boch

Part of the historic abbey complex on the premises of Villeroy & Boch's headquarters in Mettlach has been completely renovated.
Poslovni centar Adris grupe

Poslovni centar Adris grupe

Arhitektonski projekt poslovnog centra Adris u Jagićevoj ulici 33. u Zagrebu, spoj je klasičnog i modernog. Gradnja poslovnog centra započeta je 2011., a završena 2015. kada se u nju smještaju zaposlenici Adris grupe i Croatia osiguranja. 
City Hall

City Hall

The challenge began in 2021 when the building was completely redesigned to cut energy waste. Uponor Ecomate was installed to gain actionable insights into heating, cooling and power usage and improve the Town Hall's energy consumption and carbon footprint.
Magnum Business center

Magnum Business center

MAGNUM – a brand new business centre. One of the largest in Kaunas city in Lithuania.

MAGNUM aims to introduce positive change, an innovative work culture, and a responsible attitude to the environment. It will inspire these aims not only in its residents, but in the city of Kaunas itself — a city that is rapidly growing and changing.

Edificio de oficias en calle Tutor

Edificio de oficias en calle Tutor

The building located at Calle Tutor 16 (Madrid), owned by Arquia Inmuebles, has undergone a complete renovation and modernization, being partially demolished with the façade stabilized. A project designed by Tuñón y Albornoz Arquitectos and executed by SANJOSE Constructora, where the integration of Uponor's Invisible Air Conditioning in the Matrics raised technical floor developed by company Subway Systems.
Ilmalanlinna, Helsinki

Ilmalanlinna, Helsinki

Due to the interest rates of the floor structures, underfloor heating at Uponor's new head office required a solution that would raise the floor surface as little as possible. A functional result was achieved with an unusual implementation, low-structure underfloor heating plates, which are mainly used in renovations of detached houses, and which increase the floor height by only 15 millimetres.