Focus on sustainability,
Borås,
Sweden
Focus on sustainability
The town of Borås in Sweden is striving to become independent of fossil fuel. The Sobacken Project, involving a combined heat and power plant, sewage treatment plant and a production Plant for biogas, is an important part of the town’s commitment to this goal. The aim is to secure the town’s infrastructure and energy system for the future. The building of Sobacken, with its new combined heat and power plant, sewage treatment plant and additional facility for biogas production, began in the spring of 2015 and is due for completion in 2018. The project’s budget is SEK 3.4 billion and it has attracted both national and international attention due to its focus on future sustainability. For example, Sobacken will guarantee the supply of district heating to the people of Boras, will have the capacity to achieve statutory environmental limits for wastewater, handle all household sewage, and fulfil the town of Boras’ ambitious environmental goals related to renewable electricity.
- The choice of Weholite as a solution compared with traditional solutions as stainless steel or concrete is the flexibility and that Weholite is easy to handle and install, says Risto Lindberg, project leader at Tage & Söner.
- For us it feels very safe to have a project manager with supervision of the whole solution, concludes Risto.
Contractor: Veolia Water Technologies AB
Sub-contractor: Tage & Söner
Installer: Uponor Infra Project Services
Responsibility from drawing to installation
Because the sewage treatment plant needs safe and reliable pipes and couplings between its wastewater treatment basins, the contractor chose Weholite as its system solution. However, Uponor’s contribution to this complex and prestigious project is not just about supplying Weholite. It also includes project management and technical support such as design and calculations, customized products and field service with onsite installation – all coherently coordinated by Uponor Infra Project Services.
Prefabrication and customization
The primary reason for preferring Weholite to traditional solutions using stainless steel or concrete pipes was the fact that Weholite is extremely flexible and easy to work with. For example, most components can be prefabricated and customized at Uponor Infra. This implies the minimum number of complex operations on site, where poor weather and difficult environmental and ground conditions can make work more difficult. When the prefabricated components are delivered to Sobacken, Uponor Infra’s field service is called in to perform the welding and installation. With prefabricated components, the installation can be completed safely and quickly, saving both time and money. From the very first drawing to the completed installation, the process was controlled by a project manager from Uponor Infra. He was also onsite at Sobacken at least once a week, to check that Uponor Infra was fulfilling its commitments and to ensure that safety margins and quality requirements met.
Samankaltaisia projekteja
Levin matkailumekkaan Uponor Flowise -alavesisäiliöt
Kaukolämpöä auringon lämmittämästä merivedestä
Itä-Helsingin metroverkon sähkönsyöttö suojataan Uponor FastGuardilla
Vanha vedenottamo päivitettiin nykyaikaan
Brønderslev implements new treatment methods
Hybridiratkaisuja hulevesien hallintaan
Espoon Itärantaa saneerataan kestävästi
Espoo ja Ramboll Finland edelläkävijöinä – Hulevesien puhdistukseen otettiin käyttöön innovatiivinen menetelmä
Vastuullista verkostorakentamista Ultra Rib 2 Blue -viettoviemäriputkella
Heinola hakee pilottihankkeessa tuloksia ja tietoa hulevesien laadun hallintaan
Vanha vesijohto sai uuden elämän sujuttamalla
Loppusyksystä 2018 vuorossa oli Kotkaan yli 50 vuotta sitten asennettu valurautainen vesijohto, joka oli
ehtinyt jo muutaman kerran vuotaa. Kestävä ProFuse RC -putki takasi turvallisesti sujuneen saneerauksen
ja varman lopputuloksen kohteessa, johon omat haasteensa toivat tarkat liikennejärjestelyt, sillä
saneerattu linja on Suomen suurimpaan yleissatamaan johtavalla tiealueella.
Vedensaanti ei ole tuurista kiinni
Juomavesi turvallisesti vanhalle varuskunta-alueelle
Water supply in very demanding terrain in Norway
A smart retention system for an anti-flooding solution
September 2018 saw the launch of the project for a stormwater drainage system in Rzeszów, almost 26 kilometres long, in the residential District of Budziwój, which partially coincides with the floodplain of the River Wisłok. One of the elements of this system is the retention canal. The project, scheduled for delivery by May 2020, will help to finally solve flooding problems which have been plaguing the residents of this region of Poland.
Unique design ensures controlled stormwater drainage
Meander
Utilization of geothermal energy in Mezőberény, using Uponor pre-insulated pipeline system
Hyvä on harjuksen hyppiä puhtaassa Ounasjoessa
Lämmitettävät putket takaavat sammutusveden
Suoraa hyötyä kaarista
Lahti Energia käyttää työmaillaan ensimmäisenä Suomessa kaariputkia. Kokemukset ovat olleet erittäin hyviä.
Lahden Vipusenkadulla uusittiin kaukolämpöverkkoa. Kaivantoon on laskettu isoja kahdentoista ja kuudentoista metrin DN 300 -putkia. Hitsaajat ovat ryhtymässä töihin. Jokin jää kuitenkin askarruttamaan ohikulkijan mieltä.
Samaan aikaan toisaalla, keskustasta Launeelle johtavalla kaukolämpölinjalla operoidaan hieman tuhdimpien DN 400 -putkien kanssa. Täälläkin sama juttu. Aivan kuin kaikki putket eivät olisi ihan suoria?